Sagging Floor No More

Old Castle Renovations grew up repairing and remodeling century homes in London. We have years of experience and labour for the love of the older home. We are experts at levelling old floors.
Levelling a floor means that one or more structures below the floor is at fault. If the sag is in the center of the room, gravity is pulling down on those old, original floor joists. If your floor slopes unevenly toward the edges of the room it is more likely that your foundation is drooping having an effect on your whole house. The not so bad news is that this is a job for a professional renovator. The good news is that depending on the reason for a sagging floor it may not be as expensive as you think.
Jacking up the floor
Lifting the floor up to ‘level‘ from below is only advocated when the renovation is a complete ‘gut’. Pushing up the floor from underneath almost always results in cracking something, somewhere above. When hydraulic jacks are used at key points under the floor joists, the floor is gradually raised in the sagging area. In the ‘lift’, the ‘connected’ structures, walls, stairs and framing are also lifted and shifted with very high risk for cracking or splitting all the plaster or drywall in the house. In a complete gut renovation, drywall, stairs and framing are replaced with new materials after the floor is jacked up. A completely new interior is achieved with some attention to repair and preserve the exterior of the home.
Leveling the floor
The most common approach to repair a sagging floor is to ‘level’ the floor with layers of ‘leveling strips’ and subfloor materials. Layering these materials will bridge the gap between the old floor and the new, level surface. Gaps are filled using state-of-the-art Novoplan 2 Plus by Mapei. This is a high-strength, self-leveling cement-based underlay and repair mix for leveling, smoothing and repairing interior floors. The benefit of this approach is quicker curing time; normally, the leveled floor is ready for new flooring, tile or carpeting in 24 hours. This method is durable and safe for interior concrete and engineer-approved floors, including wood, manufactured wood and laminate.
With our years of experience and expert craftsmen on the Old Castle Renovations team we can give you the level, updated flooring in your home renovation. We have the knowledge and experience to seamlessly integrate new and old materials to give you a beautiful floor.